It would be great if you could build a test routine and try to keep almost everything going as planned - but that's not reality. If one thing comes up while the test area is still running, maybe you can drive forward and spot it when you're done. Just understand that all holding chamber systems are intertwined. Any rust or corrosion, normal water leaks, resident or condensed water, or atmospheric leaks indicate greater maintenance is imminent.

It is critical to address problems early as they occur. You can maintain your test area by doing the following:

Maintenance is performed quarterly and every twelve months during the period of use.

Manage your stability test chamber to check functionality before testing.

Keep your guide and various information related to your testing area nearby.

Doing so will help keep your testing area up and running and allow you to catch problems before they turn into expensive repairs.

Below are the more common test area maintenance checks so that you and your assisting staff can deal with any issues that arise.

Daily maintenance of stability test chamber

Whenever you correct it early, you'll find that most stability chamber problems require relatively simple options. This is important for two reasons only: You can do a lot of maintenance yourself, but contacting your home assistance worker is always essential, preferably an individual who understands HVAC and refrigeration. If necessary, inspections can be performed to provide context for inspection maintenance alternatives.

Routine maintenance prevents a domino effect, where small problems develop into larger, more extensive repairs.

You should maintain it consistently and wear it hard. The stability test chamber works normally. PLEASE NOTE: Safety considerations are paramount. The stability test chamber is connected to a live voltage. Any maintenance on electrical programs should be performed by an expert. Before performing any maintenance, be sure to disconnect and stabilize the chamber's capacity after using proper lock-out and tag-out methods.

Power Systems: Check your electrical program for pitting and loose contacts at relays, contacts, cable harnesses, solenoids, sensing unit clips and compressor contacts. Make sure the lower limit and period are correct. Use a multimeter to check all contacts and terminals for electrical measurements. View a large number of voltages and manage voltages and get important existing measurements. Check that all management switches and lights are working properly.

Refrigeration procedures: Check gas levels, look for leaks and accumulations. Check out different lover surgeries, including plumbing, plumbing convenience, and plumbing insulation. There is no frost everywhere, the air handler should be covered to prevent leakage, and the shock absorber should be checked. Clean the coils and straighten any bent fins. Check resting and operating stresses and emissions, as well as suction power and liquid line temperature ranges. Given that PSI facts are certain for your stability chamber, review the correct filter dryer psi limits. Basic safety checks to check development reservoir function, network gas tension and/or very low tension.

Humidity System: If you have a humidity stability test chamber, verify the float, proper plumbing and contacts, and a recommended air dryer. Drain, clean and flush common water pipes, steam generator and recommended common water tank. Check the steam generator heater for pitting and confirm that the water top quality and tension are normal. Check the dry atmosphere scrubbing function and filter system.

Process program: Check push and append collections for leaks. The strain library should have only a small amount to remove deposits. Remove the push and clean the reservoir thoroughly and thoroughly.

Finally, check all aspects of the structure from the test area: exterior surfaces, work areas and floors for punctures, tears and nicks. Check all gaskets for deterioration: entry doors, Microsoft windows, ports, cables and plugs.

If you have individual panels, check the seal at each seam. Check the reliability of the panel locking mechanism or latch. Verify that the front door functions to produce a smooth seal by inspecting the latches, latches and hinges. Clear the strain pump and condensate pump. Clean and adjust air conditioners, vacuum or sweep electrical and mechanical machine locations to remove all dust particles and grime. Change any missing or damaged basic safety labels and tags. Return the test container to the correct position, allowing 18 to 36 inches of space for optimal airflow for optimal container function.

By regularly checking your test area plan, your inspections will be easy. As well as functionality will I meet your expectations.

calibration required

In addition to the "physical" procedure, you should also analyze the digital aspects of any room. Have a professional calibrate your chamber controller every six months or so. Regular calibration stops "drift" that can lead to inaccurate test results. You'll prevent bad information and downtime to keep your test ready.

Keep in mind that well-maintained stability chambers are generally more durable than the controllers that allow you to run them. The controller may require software program upgrades and bug fixes.

Don't wait to contact the testing area for help

If your Photostability Chamber is not working as expected, please call your facilitator, Stability Chamber Company Thchamber. While professionals can solve common problems in a short period of time, more advanced functional problems may require a leveling option and may require a stability test chamber alternative.

Stay ahead of the curve by performing typical maintenance, running test containers to the top and bottom of the functional specification after testing or on a weekly schedule (even when not in use), and liaising closely with your facilitators.

The more diligent you are, the more likely your Stability Test Chamber Manufacturer will continue to operate for years after it ends.
  • Call At :

    Tel : +86 18855619709

    Whatsapp : +86 18855619709

  • Email Us :

    Email : pstc.yujiao@gmail.com

  • Address :

    1F, 2F, No.5 standard factory in the pioneer park of SMES, economic development zone in Zhenxing north road and the west of Wuling south road, Taizhou, Jiangsu.

Copyright © 2024 CHLabEquip Stability test Equipment Co.,Ltd.. All Rights Reserved.

IPv6 network supported

top

Leave A Message

Leave A Message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

  • #
  • #
  • #